Skip to content

Integrate Phase 2 batch 12: #186, #188, #189 - #190

Merged
HMarzban merged 9 commits into
mainfrom
integrate/phase-2-batch-12
Nov 22, 2026
Merged

HMarzban merged 9 commits into
mainfrom
integrate/phase-2-batch-12

Conversation

@HMarzban

Copy link
Copy Markdown
Contributor

The last batch for 2026-11-22, onto main f667af7 (batch 11).

Integration fixes on this branch:

Typecheck and 4,339 unit tests pass on the branch. No Deploy note.

- The browser suites run in four duration-packed shards.
- Perf splits into the typing budget and the feature budgets, each on its
  own runner with one worker; the gate needs both.
- Unit tests run with bun test --parallel (scripts/unit-tests.ts), the
  files that assert a wall-clock budget serially after; UNIT_SERIAL=1
  runs them all serially. A test keeps that list complete.
- The stress probe moves to a nightly job that also compares a serial
  unit run with CI's, file by file.
- Changed files logs the timings count, not the JSON.
When a green push to main publishes e2e-timings, each file's time is
averaged half and half with the timings that run packed by, so one noisy
run moves the plan only halfway. New specs keep their own time, deleted
ones drop out, and without usable previous timings the run's own are
written.
…ogether

The condition on D-A6's amendment: after a FULL append and a NORMAL
derive, a dropped last commit or a torn WAL tail keeps the append, loses
the derived rows with their derived_seq, and leaves the document stale
for the next derive to restore. The spec's amendment note points here.
…phase-2-batch-12

# Conflicts:
#	CHANGELOG.md
…2-batch-12

# Conflicts:
#	CHANGELOG.md
#	docs/superpowers/specs/2026-11-15-desktop-architecture.md
#185 (busy-timeout) and #154 (extract-perf) add wall-clock budgets; #186's
runner keeps every such file out of the parallel pass.
@HMarzban
HMarzban enabled auto-merge November 22, 2026 15:55
@HMarzban
HMarzban added this pull request to the merge queue Nov 22, 2026
Merged via the queue into main with commit 44d48d8 Nov 22, 2026
14 checks passed
@HMarzban
HMarzban deleted the integrate/phase-2-batch-12 branch November 22, 2026 16:13
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

None yet

Projects

None yet

Development

Successfully merging this pull request may close these issues.

1 participant